图片显示的地点是长江街,崇山西路(今崇山中路)以北路段(今泰山小区附近、辽宁大学东)。
图中的无轨电车15路正由北向南行驶,这是北段线路。因为城市道路建设,15路电车被分成两部分,。北段是在北陵公园与肉食加工厂间运营,肉食加工厂是一个临时终点。
正在建设的塔湾街地下通道(公铁桥),消除了铁路交叉路口对交通的影响。大部分工程都是通过手工完成的。
15路无轨电车南段是在第一粮库与南十四马路间运营,第一粮库是一个临时终点。
由于道路建设,这条沈阳的无轨电车线路被分成了两段。
I believe that this image shows 长江街, Chángjiāng jiē, south of 崇山西路 Chóngshān xīlù. (This segment of Chóngshān xīlù is named 崇山中路, Chóng shān zhōnglù, today.) The general location is just south of 辽宁大学, Liáoníng dàxué, "Liaoning Provincial University." The trolleybus is working southward, on the northern segment of Line 15. This line had been divided into two segments because of construction. The northern segment extended between 北陵公园, Běilíng gōngyuán (Beiling park), and a temporary terminal at 肉食加工厂, Ròushí jiāgōngchǎng (= "Meat Packing Plant"). An underpass was under construction to eliminate the Beijing - Shenzhen railway level crossing ("grade crossing") at 塔湾路, Tǎwān lù. Most of the construction work was being done by hand. The southern segment of trolleybus Line 15 worked between a temporary terminal at 第一粮库, Dìyī liángkù (= "Number One Grain Depot"), and 南十四马路, Nánshísì mǎlù. This was one of two Shenyang trolleybus lines with segments that had been closed temporarily because of construction works. 1983 September 13. Changjiang jie (长江街), Shenyang, 1983